From a single MDF/IDF closet to a multi-row colocation hall, we plan, build and commission the physical infrastructure your systems depend on: racks, power, cooling, cabling and monitoring, engineered for California conditions.
Clean power paths, managed airflow and tested failover remove the physical causes of outages.
Layouts and pathways are planned for your next three to five years, not just today’s racks.
Labeling, rack diagrams and as-built drawings mean anyone on your team can support the room.
A data center is only as reliable as the physical layer beneath it. Poor airflow, undersized power paths, unlabeled cabling and unbraced racks cause outages that no software can fix. We build that layer correctly the first time and document it so your team can operate and grow it with confidence.
Whether you are standing up a new server room, expanding an existing facility, or moving equipment into colocation space, we coordinate trades, deliveries and schedules so installation stays on time and your production environment stays protected.
Industries we support

Rack elevations, hot and cold aisle design, clearances and floor loading checked against your equipment and growth plan.
PDUs, UPS integration, A/B power paths, circuit labeling and load balancing, coordinated with your licensed electrical contractor.
Containment, blanking and airflow management that remove hot spots and reduce energy use.
Copper and fiber backbone and horizontal cabling, patch panels and overhead or underfloor pathways, tested and labeled.
Receiving, unboxing, racking, cabling, labeling and powering servers, storage and network gear to your build sheet.
Environmental sensors, leak detection, door access and camera coverage tied into your existing monitoring tools.
Add racks, power and cooling to an existing room or convert a spare space, with a phased plan that keeps current systems online.
Plan, move, re-rack and re-cable equipment between sites, with test windows and a rollback plan.
Receive, rack and cable equipment in a cage or suite, including cross-connect coordination with the provider.
What we handle, and what we need from you to keep the project moving.
What you receive at closeout
We walk the space, review power and cooling capacity, and capture your equipment list and growth plan.
You receive layouts, a bill of materials, a schedule and a cutover plan for approval before work begins.
We install pathways, racks, power and cabling, coordinating with electricians, mechanical contractors and your IT team.
Every circuit and link is tested, labeled and verified. Failover and monitoring are checked with your team.
As-builts, rack diagrams and test results are delivered, followed by a walkthrough and punch-list closeout.
California adds its own codes, licensing and compliance expectations. We plan for them from day one.
Racks, cabinets, cable trays and heavy equipment are anchored and braced to California Building Code requirements and your facility’s seismic design.
Cooling and airflow choices are reviewed against Title 24, Part 6 requirements for computer rooms, where they apply.
Work follows the California Electrical Code and California Fire Code, with inspections coordinated through your local authority.
UPS and generator integration is sized for your uptime goals and local utility conditions.
Standards and references
Tell us about your locations, timeline and goals. We’ll follow up with next steps and a scoped proposal.